Description
Bim 4D Simulation Using Synchro 4D Pro 2023-12 is a Udemy course taught by Mahmoud Farouk Abouzeid. Language: Arabic; Duration: 8 hours and 44 minutes; 34 lessons.
Course specifications
- Publisher
- Udemy
- Instructors
- Mahmoud Farouk Abouzeid
- Language
- Arabic
- Level
- Introductory
- Duration
- 8 hours and 44 minutes
- Lecture count
- 34
- Subtitle
- None
- Quality
- 720p
- Edition
- 2023-12
Course topics
View course topics

The course topics image is temporarily unavailable.
Prerequisites
- Prerequisite topics include planning.
Pictures

This picture is temporarily unavailable.
Introduction video
How to open the files
Extract the files and play the included course media with a compatible player.
Download resources
Choose one edition and keep its parts together. Alternate providers are available when listed.
2023-12 · 720p
Direct downloads
2023-12 · 720p
Archive password
Size
5.3 GB

Leave a Reply
Signed-in member comments appear immediately.